P&M Professional clip ice cream tool, chalk car bumper mold making

P&M Professional clip ice cream tool, chalk car bumper mold making

Short Description:

Mold making experience More than 13 years
We produce Mold, prototype, injection molding, product assembly, surface printing, spraying the surface integration
Mould Time 25 working days
Mould cavity One cavity, multi-cavity or same different products be made together
Mould cavity Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc.
Product material ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS, TPV, TPO,T PR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS.
Quality system ISO9001


Product Detail

Product Tags

new Google-48mold-10 mold-11 mold-12 mold-13

 

Tips:

We have many mold cases, no matter any mold type or any mold material, we can customize it for you.

 

 

new Google-58 new Google-57Google-5new Google-59new Google-67

 

TIPS:

1.Packaging method: The mold is packaged in wooden boxes, and the product is packaged in environmental bags and cartons.

The packaging can also be customized.

2.Delivery time: about 25 working days after payment

3.Express way: Any express way is acceptable. We generally use sea transportation, because the molds are heavy and the sea transportation is very cheap.

(It is recommended to use our factory’s freight forwarder, our freight forwarder is very professional, and the transportation cost is lower than the market price)

Google-27 Google-8Google-9

 

Q1: Are you trading company or manufacturer ?

A: We are manufacturers.We have our own 2 large factories.

Q2. When can I get the quotation?

A: We usually quote within 2 days after we get your inquiry. If you are very urgent, please call us or tell us in your email so that we can quote for you first.

Q3. How long is the lead-time for mold?

A: It all depends on the products’ size and complexity. Normally, the lead time is 25 working days.

Q4. I have no 3D drawing, how should I start the new project?

A: You can supply us a molding sample, we will help you finish the 3D drawing design,We have many professional engineers and designers.

Q5. Before shipment, how to make sure the products quality?

A: If you don’t come to our factory and also don’t have the third party for inspection, we will be as your inspection worker. We will supply you a video for production process detail include process report, products size structure and surface detail, packing detail and so on.

Q6. What is your payment terms?

A: Mold Payment: 50% deposit by T/T in advance, sending out the first trial samples, 50% mold balance after you agree the final samples. B:Production Payment: 50% deposit in advance, 50% before sending out the final goods.

Q7: How do you make our business long-term and good relationship?

A:1. We keep good quality and competitive price to ensure our customers benefit for best quality products . 2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

 

If you have any questions, you can contact by Email: candy@nbplasticmetal.com

 


  • Previous:
  • Next:

  • Related Products