Factory Supply Mold Factory - Precision Plastic Injection Mold Molding Made Mould Tooling Manufacturer Maker – Plastic Metal
Factory Supply Mold Factory - Precision Plastic Injection Mold Molding Made Mould Tooling Manufacturer Maker – Plastic Metal Detail:
Product Description
Plastic molding Specification
1. Professional manufacturer,design,production injection mould and stamping mould quality control
2. rich export experience plastic injection mould and stamping mould
3. Reasonable price of design mould
4. Cavities: single or as per your requirements cavity
5. Treatment: S45C Pretreat>25Hrc,And Nitriding
6. Mould Steel: Cavity ,Core and slide: P20 ,2738,2136 available Moldbase:LKM available
7. Standard:DEM ,HUSKY,available
8. Hot runner: according to your demand
9. Life time: >300 Thousand Times
10.Package: Plywood case, anti-rust paint
Specification
| Item | Plastic Parts |
| We promise | All customer-centric, never for short-term profit, and sell long-term benefits |
| We produce | Mold, prototype, injection molding, product assembly, surface printing, spraying the surface integration |
| Pls provide | 20-35 Days |
| Product time | 7-15 Days |
| Moud precision | +/-0.01mm |
| Mould life | 50-100 million shots |
| Mould cavity | One cavity, multi-cavity or same different products be made together |
| Mould material | P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
| Runner system | Hot runner and cold runner |
| Base material | P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 |
| Finish | Pitting the word, mirror finish, matte surface, striae |
| Standard | HASCO, DME or dependent upon |
| Software | CAD,PRO-E,UG Design Time: 1-3 days (normal circumstances) |
| Quality system | ISO9001:2008 |
Packing & Delivery
Packaging according to your needs
1.By air ,it takes 3-7 days for delivery .The goods can be shipped by DHL ,Fedex ,UPS .
2.By sea ,the delivery time is based on your port .
2.By sea ,the delivery time is based on your port .
To South East Asian Countries takes about 5-12 days
To Middle east countries takes about 18-25 days
To European countries takes about 20-28 days
To American countries takes about 28-35 days
To Australia takes about 10-15 days
To African countries takes about 30-35 days
Company Profile
FAQ
Product detail pictures:





Related Product Guide:
Cooperation
Our company insists all along the quality policy of "product good quality is base of enterprise survival; buyer fulfillment will be the staring point and ending of an company; persistent improvement is eternal pursuit of staff" and also the consistent purpose of "reputation very first, shopper first" for Factory Supply Mold Factory - Precision Plastic Injection Mold Molding Made Mould Tooling Manufacturer Maker – Plastic Metal, The product will supply to all over the world, such as: Bahrain, Hamburg, Greenland, Taking the core concept of "to be the Responsible". We will redound up on society for high quality products and good service. We will initiative to participate in international competition to be a first- class manufacturer of this product in the world.
Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!


















